Roof repair tape 75 mm, 10 m long, lead-colored, self-adhesive
| Artikelnummer | WF-887469 |
Er zijn nog geen recensies — wees de eerste
Deel je ervaring met deze aankoop en help andere klanten de juiste keuze te makenEr zijn nog geen vragen
Stel een vraag om meer te weten te komen over het productThe tape reliably bonds and seals metal, plastics, concrete, masonry, plaster, wood, and glass. It is particularly suitable for sealing:
- Joints and cracks
- Gutters
- Coverings
- Roof and wall connections
- Glass roofs and greenhouses
- Roof coverings
Double protection thanks to aluminum foil and bitumen adhesive, self-adhesive, waterproof, and weather-resistant.
Clean and easy to apply.
Also ideal for insulating, repairing, and securing corners, seams, chimneys, downpipes, zinc and plastic gutters. It is a self-adhesive, cold-applied sealing tape. The film is surface-treated, UV-resistant, and therefore has good mechanical stability. The aluminum tape's coating consists of elastomer bitumen and high-quality adhesive resins, protected by a silicone-coated film.
Length: 10 m.
| Length | |
|---|---|
| Length | 10 m |
| Colors | |
| Colors | Lead |
| Width | |
| Width | 75 mm |